Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 15, 2020     8-12 step 1-2 HS Skin on cradles and cleo structure rivet front ribs - (4 hours)       Category: Tail Feathers
positioned skins in the cradles. clecoed all front ribs to the skins.
started riveting with flush rivets.
Using the rivet swivel set didnt really help setting good rivets. I had to drill out a couple.
Changed to flush-rivet set and it worked better, although i pushed a bit too hard in two spots (skin is slightly deformed around a couple of rivets, but no major dents.
Rivets on the Inspar ribs (AN470AD4-7 and 8) are not very well set. little marring due to the squeezer.
Drilled out a bad rivet with angle drill (not easy to access) and replaced with slightly better results.
CHECK WITH LUCIO on the RIVETS on HS-905 Inspar Nose RIBS.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.